Supporting Information
Certified Plan Corrections
To allow for a shorter, simpler and more efficient building permit process, all Standard Plan Review building permit applications must use the Certified Plan Corrections program to address most types of plan review corrections issued by the Department of Buildings after a full review.
New Building Code Interpretations
On November 9, 2018, the Department of Buildings adopted three new formal written interpretations of the Chicago Building Code.
Revision Permits
Requirements for permitting a revision after a building permit has been issued.
Sandblasting, Grinding, and Chemical Washing
A permit is required for sandblasting, grinding, or chemical washing of any building, facility, statue, or other architectural surface. This permit, called an Architectural Surface Cleaning Permit, is issued by the Chicago Department of Public Health (CDPH) and is separate from any construction or renovation permit issued by the Department of Buildings.
Scaffolding Information
Scaffolding Information
Self-Certification Training Program - 2019
Materials for Self-Certification Professional Training Program, December 2-4, 2019
Structural Peer Review Program
The Structural Peer Review Program is designed to expedite the permit process by reducing the time and effort required for conventional structural plan examination by Department of Buildings personnel.
Temporary Outdoor Stage Permitting Procedures
A summary of permitting procedures and requirements for stages that will be temporary (installed at the same location for 180 days or less)
Temporary Tent Permitting Procedures
A summary of permitting procedures and requirements for tents that will be temporary (installed at the same location for 180 days or less)